Certified Maintenance and Reliability Professional (CMRP)

1 / 186

1.

A maintenance engineer has a list of air compressor failure modes, frequency of occurrence and the consequences of each failure mode. Which of the following tools can help to track reliability growth since the maintenance strategy has changed in the last 6 months

2 / 186

2.

Which of the following is used to perform analysis on reliability growth

3 / 186

3.

Availability is a function of

4 / 186

4.

Using predictive technologies, approximately what percent of failures in rotating equipment can be found

5 / 186

5.

A systematic planning and control of a physical resource throughout its life, including specification, design, construction, operation, maintenance and disposal when no longer needed is a definition for

6 / 186

6.

When measuring the temperature of an object using a radiometric imager, which two parameters have the greatest effect on the accuracy of the temperature reading on the instrument

7 / 186

7.

What is the statistical average and the population standard deviation of the following series of numbers? 1.30, 1.25, 1.50, 1.12, 1.35, 1.38

8 / 186

8.

Which of the following is considered an additive for an engine oil

9 / 186

9.

Percentage overtime maintenance labor hours is calculated as

10 / 186

10.

All the following are desired outcome of reliability improvement process except

11 / 186

11.

Work identification, planning and scheduling in a reliability business process is a _________ key performance indicator

12 / 186

12.

When the time period between the testing which detects a failure, for failures with significant economic consequences, and when life expectancy is highly variable, a good approach is

13 / 186

13.

New incoming oil from the supplier is always clean and ready to be used

14 / 186

14.

What is the most common failure mechanism for a ball bearing service

15 / 186

15.

The below diagram is known as

16 / 186

16.

A concept, a methodology or a way of working such that eliminating waste is embedded into business processes is called

17 / 186

17.

All the following are considered lagging maintenance key performance indicators except

18 / 186

18.

What does FTIR stand for

19 / 186

19.

Key performance indicators can be classified as leading or lagging indicators. An example of a lagging indicator for manufacturing is

20 / 186

20.

A technician could not find a replacement OEM filter for a pump. He orders an aftermarket filter with the same micron rating. The two-filter media with same micron rating will have

21 / 186

21.

The maintenance cost of a manufacturing plant is considered a ______ of performance

22 / 186

22.

A spring-loaded accumulator will

23 / 186

23.

The P–F interval can be applied to visual inspections

24 / 186

24.

MTBF is measured by operating time divided by the number of failures of an asset

25 / 186

25.

A diesel engine powering a process pump was diagnosed to have fuel dilution in the engine oil. Oil samples were taken and sent to the lab for analysis. Which of the following methods will be used by the lab analyst to confirm the fuel dilution problem

26 / 186

26.

Which of the following does not support people development

27 / 186

27.

For a world Class Maintenance, what is an ideal percentage of planned maintenance work

28 / 186

28.

What is the statistical mode and the median of the following data (3.0, 12.0, 9.0, 4.0, 2.0, 4.0, 4.0)

29 / 186

29.

An auxiliary pump Diesel engine oil sample results indicate 60ppm of iron from the lab. OEM recommendation for wear is 30ppm of iron. What is the next step

30 / 186

30.

A machine in the mining plant has 3 components that must work together to perform a function. If any of the components fails, the machine will not function properly. If the reliability of each component is .95, what is the reliability of this machine

31 / 186

31.

Quality is one key component of OEE

32 / 186

32.

Properly training the M&R workforce can increase asset and plant availability

33 / 186

33.

An accumulator in a hydraulic circuit is used to

34 / 186

34.

For a reliability business process, what is the meaning of F.R.A.C.A.S

35 / 186

35.

What is the RPN given the following score. Severity = 10, Occurrence = 10, Detection = 10, and Criticality = 5

36 / 186

36.

Out of the choices below, which is the best way to evaluate the effectiveness of a safety program

37 / 186

37.

FMEA is applicable only to assets currently in use

38 / 186

38.

The maintenance manager of a mining company recently formed a reliability team to improve equipment performance. The team members don't seem to get along well. Team members stick to their own style of working and challenge authority whenever they get the opportunity. Some team members are even questioning the team's goals. What developmental stage is the reliability team

39 / 186

39.

Most maintenance departments are faced with the following challenges except

40 / 186

40.

When training maintenance workers, it is best to first

41 / 186

41.

Which of the following statements about reliability is true

42 / 186

42.

Cavitation in a process pump can be caused by all the following except

43 / 186

43.

Reliability can be improved easily after a maintenance plan has been put into operation

44 / 186

44.

Utilization of assets in a world-class facility should be about 85%

45 / 186

45.

A maintenance activity that is planned and carried out in order to prevent occurrence of failure that leads to loss of production is defined as

46 / 186

46.

PM compliance is a _________ KPI

47 / 186

47.

Lagging KPIs are the results of a process

48 / 186

48.

100% of maintenance personnel’s (craft) time should be scheduled

49 / 186

49.

What is the inability of an item or system to meet the predefined performance standard established by owner or used

50 / 186

50.

Best practices would indicate that 90% or more of all maintenance work is planned

51 / 186

51.

Understanding of a P-F curve should help in optimizing PM frequency

52 / 186

52.

The primary purpose of scheduling is to coordinate maintenance jobs for greatest utilization of the maintenance resources

53 / 186

53.

Reliability and Maintainability can only be designed in

54 / 186

54.

The maintenance manager of a manufacturing plant is not happy with his asset performance. He wants to introduce an asset reliability process to improve the situation. Which one of these steps must be taken first

55 / 186

55.

The inventory turnover ratio for MRO store should be

56 / 186

56.

The reliability block diagram for a system is shown below. What is the reliability of the system

57 / 186

57.

What is the most important consideration when changing lubricant supplier

58 / 186

58.

What is the recommended methodology to reduce or increase the frequency of a PM inspection

59 / 186

59.

A rule of thumb is that, on average, an experienced planner can plan work for how many craft people

60 / 186

60.

Maintenance cost will decrease as reliability increases

61 / 186

61.

The weight per unit volume of a liquid at a standard temperature and pressure is called

62 / 186

62.

Understanding the known and likely causes of failures can help design a maintenance strategy for an asset to prevent or predict failure

63 / 186

63.

What is the use of RPN during failure mode and effect analysis

64 / 186

64.

Most of the maintenance costs become fixed

65 / 186

65.

New oils supplied to the plant are usually _______ OEM recommended oil cleanliness for the plant equipment

66 / 186

66.

a Team tasked to perform FMEA on a plant equipment will be using RPN to rank the failure modes. What is the meaning of RPN

67 / 186

67.

When a pump has angular misalignment, the pump

68 / 186

68.

A solenoid activated valve may not shift if the

69 / 186

69.

The ISO cleanliness code of an engine oil is given as 18/16/13, the code "16' represents

70 / 186

70.

A hydraulic pump produces

71 / 186

71.

What is it called when during mounting, the internal clearances of tapered roller bearings are removed

72 / 186

72.

The task of developing procedures and making work orders for maintenance work activities including identifying resource requirements, safety precautions and special work instructions required to execute the work will be performed by a

73 / 186

73.

The failure rate of a component / asset can be calculated by knowing

74 / 186

74.

RCM team for a process plant selected a scheduled discard as part of their recommendation. This implies that the team had a clear evidence that the asset had experienced what

75 / 186

75.

What is the meaning of FTA during equipment reliability analysis

76 / 186

76.

What percentage of maintenance work should be proactive

77 / 186

77.

The kinematic viscosity is the

78 / 186

78.

How soon we can restore an asset is measured by

79 / 186

79.

100% of PM and PdM tasks should be developed using FMEA /RCM methodology

80 / 186

80.

What is the evolution of maintenance in accordance to time

(I) Corrective Maintenance

(II) Predictive Maintenance

(III) Preventive Maintenance

(IV) Proactive Maintenance

81 / 186

81.

For a world class maintenance planning and scheduling, what percentage of man-hours is allocated to breakdown or emergency work

82 / 186

82.

TPM is a type of maintenance performed by the operators

83 / 186

83.

Best Practices are practices that are defined and applied by an organization to improve their operation. These practices may or may not be proven, but results are found to be acceptable

84 / 186

84.

What is the term used to describe a fluids internal resistance to flow

85 / 186

85.

The best method of measuring the reliability of an asset is by

86 / 186

86.

An MRO storeroom shouldn’t be stocking parts for emergencies

87 / 186

87.

Cavitation is caused by

88 / 186

88.

What is the formula for calculating availability

89 / 186

89.

Traditional types of on-condition maintenance involve all the following except

90 / 186

90.

A strainer installed at the inlet of a hydraulic pump is rated by

91 / 186

91.

What is a standard methodology to reduce or increase the frequency of a PM inspection

92 / 186

92.

RCM stands for

93 / 186

93.

When forming teams to address reliability issues, four stages of team development should be recognized and managed by the reliability professional. These stages in order are

94 / 186

94.

The maintenance manager of a mining company has all the following as his deliverables except

95 / 186

95.

Fluid flow is represented by the use of Reynolds number, which of the following represents a laminar flow

96 / 186

96.

Which fluid has the best heat transfer properties

97 / 186

97.

Most emergency work orders should be written by production/operations

98 / 186

98.

A series system made of 3 components functions good only if all 3 are working properly, if each component has a reliability of R, what is the system reliability

99 / 186

99.

An IR thermography window is an effective method to satisfy NFPA 70E arc flash requirements

100 / 186

100.

All these gears are used to connect two parallel shafts except

101 / 186

101.

What relationship should Maintenance and Reliability Teams have with customers and suppliers for optimum effectiveness

102 / 186

102.

A ______ is used to protect components in a fixed displacement pump circuit

103 / 186

103.

Operations notified maintenance department about an unusual bearing noise when a process water pump runs for more than 8 hours continuously. After a regular PM was completed and production had started, it was noticed that bearing noise was not fixed. Amongst the following, which one is the most credible reason for this occurrence

104 / 186

104.

EOQ improves the inventory turn ratio

105 / 186

105.

When the operating temperature of a hydraulic oil is at 70 degrees and it is raised by 10 degrees due faulty oil cooler, what is the impact

106 / 186

106.

Karl Fischer’s Coulometric Titration Method is an effective technique to determine the metallic content (in PPM) in an oil sample

107 / 186

107.

A plot is a simple power curve of cumulative time and cumulative failures. The data, when plotted on log-log paper, usually results in straight lines. What is this plot called

108 / 186

108.

Which one of the following is not a major test method for a membrane filter

109 / 186

109.

What is the statistical average and the population standard deviation of the following data (3.0, 12.0, 9.0, 4.0, 2.0)

110 / 186

110.

A large manufacturing company installed some asset monitoring device on some large motors that were deemed critical equipment. The monitoring devices provide engineering with vibration data, acoustic data, as well as operational performance data. What asset management strategy has the company selected for the motors

111 / 186

111.

Leading KPIs predict results

112 / 186

112.

From the following list, which is not a critical structural element of a strategic plan for maintenance and reliability

113 / 186

113.

Which of the following is not a primary objective for implementing a Planning process

114 / 186

114.

RCM provides best results when used

115 / 186

115.

Time-based PMs should be less than 20% of all PMs

116 / 186

116.

Which of the following metrics definitions is not accurate

117 / 186

117.

Which of the following statements about reliability is true

118 / 186

118.

A fault tree has three input events to an OR gate. This means that

119 / 186

119.

The “F” on the P–F Interval indicates that equipment is still functioning

120 / 186

120.

Which of the following most effectively makes up the members of a Manufacturing Team

121 / 186

121.

What is a statement of principles used to achieve maintenance objectives and guide maintenance management decision making

122 / 186

122.

For maintenance planning and scheduling, the amount of time it takes to create purchase requisition, order parts and have it delivered to warehouse ready for use is called

123 / 186

123.

The primary purpose of operations involvement in the maintenance program is to

124 / 186

124.

Creating a reliability culture from a reactive mode can be accomplished in a short period of time if enough resources are made available

125 / 186

125.

What percentage of your assets should be ranked critical based on the risk to business

126 / 186

126.

A maintenance team observe that a new gear box that was installed recently has failed. Further investigation revealed that the gear teeth were misaligned during installation. What category will this failure mode fall under on the bath-tube curve

127 / 186

127.

A system was the structure has a built-in redundancy. Components are backed up, and the system will work even if some of the components fail to function is considered a

128 / 186

128.

A simple computer consists of a processor, a bus and a memory The computer will work only if all three are functioning correctly. The probability that the processor is functioning is 0.99 that the bus is functioning 0.95, and that the memory is functioning is 0.99. What is the reliability of the computer

129 / 186

129.

Which of the following methods is used to perform elemental analysis on oil

130 / 186

130.

In the life cycle of a piece of equipment, when is the best time to work on reducing corrective maintenance time

131 / 186

131.

Which one of the following is generally true

132 / 186

132.

Name 2 Hydraulic system pressure control valves that typically produce heat in operation

133 / 186

133.

As the maintenance manager for a manufacturing company, you have conducted a study that reveals the mechanics, on average, spend four hours per ten-hour shift on wrench time (tool turning time). Your first action should be

134 / 186

134.

In grease storage, what is the term used to describe the oil separation from the thickener

135 / 186

135.

A reliability statement should contain four elements. Identify these elements

136 / 186

136.

All maintenance personnel’s time should be covered by work orders

137 / 186

137.

Which rolling element bearing can't handle any thrust load

138 / 186

138.

PM schedule compliance should be equal or greater than 95%

139 / 186

139.

In 'which of the following circumstances might it be appropriate to conduct a Failure Modes and Effects Analysis

140 / 186

140.

For a parallel system, the rate of increase in reliability with each additional component decreases as the number of components

141 / 186

141.

A skills audit is undertaken to

142 / 186

142.

Which rolling element bearing cannot handle any thrust load

143 / 186

143.

The best method of measuring the Reliability of an asset is by counting downtime events

144 / 186

144.

The gear used to convert rotary motion into translating motion is

145 / 186

145.

Maintainability is measured by PM schedule compliance

146 / 186

146.

Which one of the following is the most common qualitative test method for water in oil sample

147 / 186

147.

A multi-grade oil is designated as 10W-40, what does the W stand for

148 / 186

148.

Which device is used to determine the mix ratio of water-soluble coolants

149 / 186

149.

What is the formula for Risk Priority Number (RPN)

150 / 186

150.

What is the beta ratio of a filter media that has a particles size of 50,000ppm at upstream and 500 downstream

151 / 186

151.

Which of the following is not a method of water removal from a system

152 / 186

152.

XYZ company purchased a pump and defined its performance in the current operating contest as 250 GPM at 60 Psi for 18hrs a day. If after two months, an operator finds that the pump is delivering 100 GPM at 30 Psi. How will this pump be described to the maintenance manager

153 / 186

153.

A tool that produces a diagram that displays various conditions that could cause a particular failure is

154 / 186

154.

When considering seals to maintain a lubricant within a vessel, which failure mechanism is likely caused by extreme temperature

155 / 186

155.

When initiating change to an existing process or program, the best practice is to

156 / 186

156.

Which phase of the asset life cycle has the highest cost

157 / 186

157.

The primary function of ________ is to coordinate the availability of assets to be maintained with all required resources; this include labor, material and services required to execute maintenance work

158 / 186

158.

Which diagram is illustrated in the picture below

159 / 186

159.

What are the three elements that form the fire triangle

160 / 186

160.

What is the pressure exerted on a hydraulic system if a load of 2000Lbs acts on a 4in sq area of fluid

161 / 186

161.

The probability of a system, a component or a device to perform it's required function without failure under current operating environment for a stated period is defined as

162 / 186

162.

Weibull (life data) analysis is primarily used for

163 / 186

163.

The 6th S in the 6 S (also called 5 S plus) process stands for safety

164 / 186

164.

A farmer in a rural area had problems with his tractor tires. He called a maintenance personnel to replace two front tires that had gone flat overnight with two used ones he had in storage. He had determined that the two rear tires had been recently replaced with new ones. If reliability of the front tires were 0.97 each and that of the rear tires were 0.99 each. What is the reliability of the system of tractor tires

165 / 186

165.

The biggest benefit of a Failure Modes and Effects Analysis occurs during

166 / 186

166.

Operations and Maintenance must work as a team to achieve improved OEE

167 / 186

167.

A Weight loaded accumulator will

168 / 186

168.

With series systems, reliability _______ as the number of components increases

169 / 186

169.

RCM methodology can’t be used effectively on new systems being designed

170 / 186

170.

With the exception of emergency work orders, Planning and Scheduling will benefit all maintenance work

171 / 186

171.

What are the three most significant constraints when developing a Maintenance and Reliability organization

172 / 186

172.

_____In a vendor managed inventory system, parts replenishment is conducted by

173 / 186

173.

The temperature at which grease passes from a semi-sold to liquid state under ASTM D2265 condition is called

174 / 186

174.

It should be common practice for Operators to perform PMs

175 / 186

175.

Which performance result best shows a maintenance and reliability manager that the scheduled maintenance activities being implemented are effective

176 / 186

176.

Vibration monitoring can detect uniform impeller wear

177 / 186

177.

A maintenance engineer has a list of pump failure modes and the frequency of occurrence. Which of the following diagrams can help prioritize maintenance actions

178 / 186

178.

The objective of RCM is to preserve functions

179 / 186

179.

Of the following, what is the best method for measuring employee skills and training?

180 / 186

180.

An equipment maintenance strategy where there is no routine maintenance. Tasks performed are only corrective in nature and only done when the machine has failed is called

181 / 186

181.

Which one of the lubrication delivery method is not a gravity type

182 / 186

182.

Name two hydraulic system pressure control valve that typically do NOT produce heat in operation

183 / 186

183.

The 10% rule of PM is applied on critical assets

184 / 186

184.

During maintenance planning and scheduling, the planner must consider all the following except

185 / 186

185.

In a highly loaded gear application, which lubrication condition is predominant for adhesive wear to occur

186 / 186

186.

If a machine is run for 500 hours and five failures are observed during this period, what is the Mean Time Between Failure